Toyota Arena is open now. The rest of the district opens in 2027.

Business

Phase One space is being leased now, ahead of 2027 delivery.
4000 Ontario Center Parkway, Ontario, California Developed by Adept Urban · Leasing by CBRE
Aerial photograph of the Capital City site with Toyota Arena and Phase One under construction
Under construction

Vertical is underway

Phase One is rising alongside Toyota Arena. The photographs below are from the site itself, not renderings.

NowVertical construction on Edge and Echo
2027Phase One delivery
OpenToyota Arena, 300+ events a year
From the site

What the district looks like today

Structures are up, facades are going on and the public space is being formed. Toyota Arena has been running throughout.

Aerial view of Phase One under construction beside Toyota Arena
On site

The whole block

Phase One wraps the arena on two sides. The frames are up and the facades are being closed in.

Formwork for the plaza fountain with Toyota Arena beyond
On site

The Plaza takes shape

Formwork for the central water feature, on the axis that runs from the arena doors into the district.

Residential blocks under construction around a courtyard
On site

Homes above the shops

The residential levels that sit over the Edge and Echo ground floors, around a shared courtyard.

A district street under construction between two residential blocks
On site

The streets between

The pedestrian routes that will connect the arena, the Plaza and the shopfronts.

Toyota Arena from above, with the district site around it
Open now

Toyota Arena

The anchor has been open throughout, with 300+ events a year.

Scaffolding across a residential facade on the site
On site

Facades going on

Scaffolding across the upper levels as the exterior is closed in ahead of fit‑out.

Crew walking a street on the Capital City site
Every week

The roster is forming now

Operators selected during this window will define the first phase of the district.

Inside the shell

Past the frame, into fit‑out

The ground-floor spaces at Edge and Echo are being handed over as shells, with the structure, the service corridor and the utilities in place. Delivery conditions are agreed per suite.

Concrete structure and services inside a ground-floor space
Ground‑floor shell
Timber framing and services overhead inside a residential level
Residential level
Timeline

Where the project stands

Phase One delivery is targeted for 2027. Toyota Arena has been open throughout.

  1. Complete

    Entitlements & groundbreaking

    Approved with the City of Ontario, site works finished.

  2. Now

    Vertical construction

    Edge and Echo structures rising alongside the arena. Leasing open.

  3. 2027

    Phase One delivery

    First retail, dining and residences open to the public.

  4. Beyond

    Full build‑out

    Hospitality, further residential and expanded public space.

Reviewing the district plan on site
The district plan on site
Behind it

Built by Adept, with the City of Ontario

For more than four decades, Adept Urban has helped shape Southern California through integrated architecture, development, construction and design. Capital City is being delivered in partnership with the City of Ontario, with leasing by CBRE.

Drone view of the Phase One structures and the Plaza site
Follow the build

We publish new site photography as the structures top out and fit‑out begins.

Contact

Let's talk

Tell us what you're after and the right person comes back to you, usually within one business day.

Download the leasing brochure (PDF)

Pick an option so we can route your message.

Enter your name.

Enter a valid email address.

We'll only use this to reply. No lists, no sharing.

Sent. We'll come back to you within one business day.

Contact the leasing team directly
On site Inquire