Toyota Arena is open now. See what's on Phase One delivering 2027 · Now leasing
Capital City Inquire

Visit

Toyota Arena is open now. The rest of the district opens in 2027.

Business

Phase One space is being leased now, ahead of 2027 delivery.
4000 Ontario Center Parkway, Ontario, California Developed by Adept Urban · Leasing by CBRE
For media

Press kit

Everything you need to write about Capital City: the boilerplate, the confirmed numbers, the logos and the imagery. Anything not listed here is available on request.

Boilerplate

How to describe the project

Two versions, both cleared for use. Please keep the wording as written; if you need a different length, ask and we will write it.

Short, about 25 words

Capital City is a walkable mixed-use district in Ontario, California, anchored by Toyota Arena. Phase One delivers retail, dining and homes in 2027.

Long, about 70 words

Capital City is a walkable mixed-use district in Ontario, California, developed by Adept Urban in partnership with the City of Ontario. It is anchored by Toyota Arena, an 11,000-seat venue with 300+ events a year. Phase One, delivering in 2027, adds approximately 49,000 square feet of ground-floor retail and dining across two buildings, Edge and Echo, with about 600 homes above them and a public plaza between. Leasing is by CBRE.

Who to credit

Developer: Adept Urban. In partnership with: City of Ontario. Leasing: CBRE. Renderings should be credited to Adept Urban; construction photography to Capital City Ontario.

Fact sheet

The confirmed numbers

Every figure below is confirmed. Anything still being dimensioned is marked as such, and we would rather you left it out than estimated it.

  1. Location4000 Ontario Center Parkway, Ontario, California 91764Confirmed
  2. DeveloperAdept Urban, in partnership with the City of OntarioConfirmed
  3. LeasingCBREConfirmed
  4. AnchorToyota Arena, 11,000 seats, 300+ events a year, open nowConfirmed
  5. Phase OneEdge (Lot A) and Echo (Lot B), the Plaza, roughly 400 residences above Edge and roughly 200 above EchoConfirmed
  6. Edge, Lot A~27,000 SF of restaurant space below roughly 400 residencesConfirmed
  7. Echo, Lot B~22,000 SF of ground-floor space below roughly 200 residencesConfirmed
  8. DeliveryPhase One targeted for 2027; vertical construction underwayConfirmed
  9. Beyond Phase OneHospitality, further residential and expanded public spaceProposed

Trade-area figures: 28M annual visitors to Ontario Mills, 7M+ annual passengers at Ontario International Airport, 3,000+ residential units within one mile. Underlying sources are in the market report, available on request.

Logos

Brand files

Use the wordmark on light backgrounds and the light version on dark. Please do not recolour, stretch or add effects to either.

Capital City wordmark, dark version

Wordmark, dark

For light backgrounds. WebP, 320 by 168.

Download
Capital City wordmark, light version

Wordmark, light

For dark backgrounds. WebP, 320 by 168.

Download
Capital City mark

Mark

Vector, for small sizes and favicons. SVG.

Download
Imagery

Renderings and site photography

Renderings show the district as designed; photography shows it as built so far. Please label which is which, and credit as set out above.

Aerial photograph of the Capital City site under construction
Photograph

The site today

Toyota Arena with Phase One rising beside it.

Download
Capital City Plaza with the central fountain
Rendering

The Plaza

The public space at the centre of Phase One.

Download
Edge, Lot A: plaza-fronted restaurant frontage
Rendering

Edge, Lot A

Restaurant frontage facing the arena doors.

Download
Echo, Lot B: Suites 1 and 2 on the Plaza edge
Rendering

Echo, Lot B

Everyday retail along the Plaza edge.

Download
Residential blocks under construction around a courtyard
Photograph

Residences under way

The homes above the Edge and Echo ground floors.

Download
Formwork for the plaza fountain with Toyota Arena beyond
Photograph

The Plaza taking shape

Formwork for the central water feature.

Download

Higher-resolution files, additional renderings and the full construction set are available on request.

Reviewing the district plan on site
Press enquiries

Interviews, site visits and anything not listed here.

Contact

Let's talk

Tell us what you're after and the right person comes back to you, usually within one business day.

Download the leasing brochure (PDF)

Pick an option so we can route your message.

Enter your name.

Enter a valid email address.

We'll only use this to reply. No lists, no sharing.

Sent. We'll come back to you within one business day.

Contact the leasing team directly
Fact sheet Inquire